488
Concreting berm
in front of wall-
The extent of the proposed concfeting of the rubblo
berm in front of the foundations, as shown on the trace which
accompanied the Report, is quite satisfactory.
Jorcles for the Front courses.
I note that the proposal to jorgle torether the
Granite
front courses of the concrete blocks is arrend to.
facing
fer Concrete blocks. I am of opinion that the extra cost of facing
concrete foundation blocks with ranite, which the Surveyor
General estimates at $31,000, will be arply justified.
The
t'o
blocks proposed to be faced, form torather, two fifths of the
total height of the wall, and they constitute the most important
portion of the structure. As the provision of a franite face
for these blocks (see section returned herewith) would result
in te production of a stone face throughout the entire height
of the wall, I am strongly of opinion that the work should be
oxocuted accordingly, no especially as the additional cost
would only amount to somewhat less than six per cont on
the
outlay required on the masonry of the wall itself, irrespective
of the rubble mound, backing tc,.
5
Thore can I take it,
bo
no question as to the permanence of the work being promosad
tlloreby, a granite face being, of course, proferable to concrate,
more especially for the loway and exposed courses of the wall.
I